Quality & Precision
Quality is built into every operation
Quality is not a final gate at the end of the process. It is established in how a job is planned, fixtured, machined and measured. Every operation is set up against the drawing and the customer specification, with inspection steps defined before production begins.
A defined sequence, not a final gate
- 01
Contract & Drawing Review
Drawings, specifications and inspection requirements are reviewed before a job is accepted, with questions raised in writing.
- 02
Process Planning
Routing, workholding, tooling and inspection points are defined so the process is capable before material is committed.
- 03
Dimensional Inspection
Critical features are measured against the drawing, with results recorded and traceable to the job and lot.
- 04
Process Control
Proven parameters are held across the run, with in-process checks at defined intervals and corrective action when a trend appears.
- 05
Documentation & Traceability
Inspection records and material documentation are retained and supplied where your requirements call for them.
- 06
Continuous Improvement
Repeat work is reviewed for cycle, setup and inspection improvements that reduce variation rather than add risk.
What customers can expect on every job
Quality assurance
Inspection requirements are agreed at quote and built into the routing, so the method of verification is decided before the first operation.
Dimensional inspection
Critical features are measured against the drawing and recorded. Results stay attached to the job and the lot.
Process control
Proven parameters are held across a run, with in-process checks at defined intervals and action taken when a trend appears.
Documentation & traceability
Material documentation and inspection records are retained and supplied where your requirements call for them.
Continuous improvement
Repeat work is reviewed for setup, cycle and inspection improvements that reduce variation rather than introduce risk.
Customer specifications
Your drawing and specification govern the work. Where something is unclear or not manufacturable as drawn, it is raised before machining.
Verified details only
Certifications and registrations are listed here only once they have been verified. Nothing is published in advance of confirmation.
Certification and standard documentation is provided on request, and only for approvals currently held. Contact us with the specific standard your program requires and we will confirm in writing.
Ask about a standard