Documented systems, verified to standard

Certification, continuous improvement and quality planning are how we prove the process is capable, not just that the part measured well once.

Facility Certification

ISO 9001:2015 quality management system

Our facility operates under a certified ISO 9001:2015 quality management system covering the machining, inspection and delivery of components to customer drawings and specifications. Certification is maintained through scheduled surveillance audits and an internal audit program.

Controlled documentation

Work instructions, setup sheets and inspection plans are issued under revision control, so the shop floor works from the current approved revision.

Calibration and equipment control

Measuring instruments and gauges are calibrated on a defined interval, with records retained against the tool and the jobs it verified.

Nonconforming material control

Suspect material and parts are identified, segregated and dispositioned before anything reaches a customer.

Corrective action

Every nonconformance is investigated to root cause, with corrective action verified for effectiveness rather than simply closed.

Internal audits

Processes are audited on a planned schedule by trained auditors, with findings tracked to closure.

Management review

Quality objectives, performance trends and improvement actions are reviewed on a fixed cadence by facility leadership.

Certification held

ISO 9001:2015

Quality Management System

Scope
Precision CNC machining, inspection and delivery of machined components.
Surveillance
Annual surveillance audit, with recertification on a three-year cycle.
Documentation
Certificate and scope statement supplied on request with your RFQ or supplier package.
Request certification documents
Operational Excellence

Controls, planning and a trained team

Excellence at C&M is how the work is controlled and how the team is built. Jobs run on released work controls, priorities are set by leadership, in-process inspections catch drift during the run, and training is planned against a live skills matrix.

01

Work controls

Every job runs on a released traveler with the current drawing, routing, setup sheet and inspection requirements, so the operator works from the approved revision and nothing else.

02

Executive priority planning

Leadership sets the priority order across capacity, delivery risk and improvement work on a standing planning cycle, so the shop floor and the office are working the same list.

03

In-process control inspections

Critical features are checked at defined intervals during the run, not only at final inspection, with results recorded against the job and the lot.

04

On-the-job training

Operators are trained at the machine by qualified trainers against a written checklist, and are released to run an operation only after sign-off.

05

Cross-training

Coverage is planned deliberately: each key operation has more than one qualified operator, so absences and volume swings do not stall a schedule.

06

Skills matrix and qualification tracking

A live skills matrix shows who is qualified on which operation and at what level, and drives the training plan for the next quarter.

APQP Methodology

Advanced Product Quality Planning

New programs follow the APQP framework so quality is planned into the process before the first production part is machined. Each phase closes with defined outputs that the customer team can review.

  1. Phase 01

    Plan and define the program

    Customer requirements, volumes, timing and feasibility are reviewed with the program team before quoting, and the quality planning timeline is agreed.

    • Voice of customer review
    • Feasibility sign-off
    • Timing plan
  2. Phase 02

    Product design and development

    Drawings and specifications are reviewed for manufacturability, with prototype parts used to validate critical features and tolerances early.

    • Drawing and spec review
    • Prototype validation
    • Design review record
  3. Phase 03

    Process design and development

    The process flow, PFMEA, control plan and work instructions are written before production, along with the gauging strategy and inspection method.

    • Process flow diagram
    • PFMEA
    • Control plan
    • Gauge and MSA plan
  4. Phase 04

    Product and process validation

    A validation run proves the process at production settings, with capability studies, measurement system analysis and first article inspection.

    • First article inspection
    • Capability studies
    • MSA results
    • PPAP submission
  5. Phase 05

    Feedback, assessment and corrective action

    Launch performance is monitored against the plan, variation is reduced, and lessons learned are fed back into the next program.

    • Launch monitoring
    • Corrective action
    • Lessons learned

Documentation we support

  • Process flow diagrams
  • PFMEA
  • Control plans
  • First article inspection reports
  • Measurement system analysis
  • Process capability studies
  • PPAP documentation

Compliance documentation

Need our certificates, control plans or PPAP package?

Send the standard and documentation your program requires with your RFQ and we will confirm what is available in writing.